Certificates and realisations

Our experience affects
Your satisfaction

Thanks to numerous certificates necessary in the maritime industry, we carry out orders regardless of the location or type of ship. Our engineers can also perform work during the vessel’s cruise. Check which documents you will need in your case.

ISO 9001:2015
ISO 9001:2015
MIST
MIST
MIST
MIST
H2S
H2S
ABB drive operation/comissioning/calibration
ABB drive operation/comissioning/calibration
Travel Vaccinations
Travel Vaccinations
EU digital COVID certificate
EU digital COVID certificate
Industry Ethernet
Industry Ethernet
IX Developer Design and Maintenance
IX Developer Design and Maintenance
SEP 1kV operation/ supervision/ measurements
SEP 1kV operation/ supervision/ measurements
ROV Pilot Technician Diploma
ROV Pilot Technician Diploma
ROV logbook
ROV logbook
K POS Maintenance
K POS Maintenance
Medical certificate MLC
Medical certificate MLC
Medical first aid
Medical first aid
GWO safety courses
GWO safety courses
Fast rescue boat
Fast rescue boat
Survival craft
Survival craft
PST - Personal survival techniques
PST - Personal survival techniques
Fire fighting ADV (Advanced fire fighting)
Fire fighting ADV (Advanced fire fighting)
Personal safety and social responsibilities
Personal safety and social responsibilities
Electro-technical officer diploma
Electro-technical officer diploma
Engine room resource management
Engine room resource management

Realisations

Image link

Source: https://static.vesselfinder.net/ship-photo/9211004-261535000-b33f964f184a4d9b1de79144261c367c/1?v1

Fairplay

M/V Fairplay-26:
  • repair and diagnosis of the anchor winch system and towing system based on the Wago PLC controller
Image link

Source: https://static.vesselfinder.net/ship-photo/9133410-412379590-afc45e5052bf0e76d8dbec0e5d6b700a/1?v1

Chipolbrok

M/V Hong Fa Shang Hai:
  • diagnosis and repair of the power management system,
  • regeneration and commissioning of the KD-30 integrated automation system,
  • air conditioning system maintenance and repair,
  • regeneration and commissioning of the Fahm 200 main engine control system,
  • repair and diagnosis of the KR-100 unattended system,
  • repair of the bilge sensor system in cargo spaces,
  • CO2 system repair,
  • diagnosis and repair of the power generator management system.
Image link

Source: https://www.dalex.gr/images/fleet/more/DINO_1.jpg

Dalex Shipping CO SA

M/V Dino:
  • diagnosis and repair of the incinerator control system.
Image link

Source: https://static.vesselfinder.net/ship-photo/9425423-249122000-f9ac7cfcaf4f3eb6844c7d903a66eeb3/1?v1

Polskie Ratownictwo Okretowe

M/V Amber II:
  • repair and diagnosis of the automatic start system of the emergency generator based on PLC Telemecanique Micro,
  • regeneration and commissioning of the control of the generator set based on the PLC Schneider Twido controller.
Image link

Source: https://static.vesselfinder.net/ship-photo/9267027-538090366-302ee15c35713c5f20faa41275883636/1?v1

PT BUANA LINTAS LAUTAN TBK

M/V Bull Kangean:
  • repair and calibration of the main engine control system controlled from the bridge based on Lyngso,
  • repair and calibration of the main engine control system controlled from ECR based on Lyngso.
Image link

Source: https://eddawind.imgix.net/wp-content/uploads/2021/05/CSOV-C489-ef1-scaled.jpg?auto=format

Edda Wind

M/V Edda Nordri
  • participation in the commissioning works of the Colibri project.
Image link

Source: https://static.vesselfinder.net/ship-photo/9610169-477776300-0ac1d199316bd9eb1caba6957a9afe43/1?v1

Anglo Eastern Ship Management

M/V Detroit Express:
  • installation and commissioning works of the ship’s remote surveillance system.
Image link

Other work done for clients:

  • Designs of electrical installations in the ship’s engine room, bridge and on deck,
  • Commissioning work on cranes and elevators based on Siemens S7-1500, S7-1200 PLC controllers and ABB ACS-880 and Siemens Infeed drives.